Cluster Control Plane Assembly

Table of Contents


1 Remove Power shunts

Remove all the red power shunts. As you proceed, check each set of pins for any that are bent or mis-aligned. Fix any problems before attempting to install BitBars.

01.jpg

2 Install BitBar Power Control Strips

Work with the LED end of the BitBar away from you. Place the BitBar over the pins, and starting from the LED end, let the pins find the socket holes.

02.jpg

If the pins catch, you should gently flex the Blade pcb so the pins find the socket easily.

03.jpg

Once all the pins are sitting in the socket entries, start from the LED end and gently ease the BitBar down so all the sockets are flush. Pay attention as you push the BitBar down. If there is any resistance check that the pins are correctly aligned before proceeding.

04.jpg

3 Install Bridge Boards

With all the BitBars correctly seated, next attach the Bridge PCBs to the 10 way socket header on each BitBar

05.jpg

Attach the short 10 way IDC cables between the Bridge PCBs in adjacent cluster packs.

06.jpg

Attach the long 10 Way IDC to the Quattro Bridge IN port at the very front of the module.

07.jpg

The wiring of the BitBars sets the geographical address for the nodes. To ensure the front row of nodes is as the lowest address the cable must be connected to the front cluster pack in the module. The control flow from the Cluster Hub should follow the arrows on the Bridge PCBs, shown as either IN or OUT (in this case for Quattro, Duo is similar).

08.jpg

4 Install HUB Power Controller Board

Remove the rear panel of the module to access the wiring loom and Hub.

09.jpg

The new Active Cluster Hub is a direct replacement for the old one, with some minor mounting changes. The lever connectors for the front panel LEDs have been moved to between the FAN sockets, otherwise all connectors are in the same place. Remove the outer metal standoffs. Use the four adhesive PCB standoffs supplied in lieu. The inner standoffs are unchanged.

10.jpg

The Active Cluster Hub now has a 10 Way box header which accepts the long IDC cable to control the BitBars

11.jpg

The RPi on the Active Cluster Hub is powered by +5 volts from a Duo Blade. The 3 pin header is at the bottom left.

12.jpg

Attach the other end of this twisted cable to the nearest Duo Blade IMPORTANT: This cable is not reversible! The Cluster Hub end connects to the outer pins, the Blade end is +5 on the center pin. It's important to connect to power on a Duo Blade in the cluster (not a Quattro Blade).

13.jpg

The Raspberry Pi on Active Cluster Hub needs to be connected to the client computer. The HUB runs its own operating system, normally bootstrapped from SD card. However, it may be connected to the network and PXE booted as well. When connected to the BitBars all other nodes in the cluster will detault to POWER OFF when the cluster is powered. This means that until the Active Cluster Hub is powered and bootstrapped and running, the cluster itself will remain quiecent. Each BitBar has a Yellow LED connected to the 16th bit of its control register. The software driver will normally turn all these LEDs ON when initialisation is complete. To confirm the control plane is physically connected to each node, disconnect the ribbon cable from the Cluster Hub. In this case when the cluster is powered on, the default state for all nodes is also on (just as if the control plane was not installed).

6 References

Permalink https://docs.bitscope.com/QKSD4SAT
Document ID QKSD4SAT 02
Copyright © 2018-2019 BitScope Designs
   
Revision Update
02 [2019-05-09 Thu] updated
01 [2018-11-30 Fri] created